Nimitz Walkway Canopies
This project at Nimitz Middle School involved the renovation and structural upgrade of existing walkway canopies, performed on a fully occupied campus.
Scope included removal of the existing canopy roofing and fabrication and installation of new structural steel supports to elevate and re-route electrical, mechanical, and communication utilities. The work required the relocation and replacement of conduit, junction boxes, and gas lines, coordinated for safety and continuity. Final installation featured a prefabricated Avadek aluminum awning system with a multi-layer roofing assembly including peel-and-stick base ply, torch-applied cap ply, and a modified bitumen roof.
Market
K-12Architect/Engineer
Wiss, Janney, Elstner AssociatesType
RenovationOwner
North East ISDNimitz Walkway Canopies
San Antonio
August 2009
This project at Nimitz Middle School involved the renovation and structural upgrade of existing walkway canopies, performed on a fully occupied campus.
Scope included removal of the existing canopy roofing and fabrication and installation of new structural steel supports to elevate and re-route electrical, mechanical, and communication utilities. The work required the relocation and replacement of conduit, junction boxes, and gas lines, coordinated for safety and continuity. Final installation featured a prefabricated Avadek aluminum awning system with a multi-layer roofing assembly including peel-and-stick base ply, torch-applied cap ply, and a modified bitumen roof.
Market
K-12Architect/Engineer
Wiss, Janney, Elstner AssociatesType
RenovationSize