Leon Creek Greenway
This project consisted of the installation of ¾ mile of 10-foot-wide concrete hike and bike trail as part of the expanding Leon Creek Greenway. The trail supports safe, accessible outdoor recreation and improved connectivity within the city’s greenway system.
The scope included concrete foundations, curbs, asphalt paving, stone assemblies, metal fabrications, and signage. Additional work involved masonry, irrigation, landscaping, electrical distribution, site lighting, and pavement markings to ensure long-term durability and user safety.
Market
MunicipalArchitect/Engineer
Slay EngineeringType
New ConstructionSize
39,600 sfOwner
City of San AntonioLeon Creek Greenway
San Antonio
June 2015
This project consisted of the installation of ¾ mile of 10-foot-wide concrete hike and bike trail as part of the expanding Leon Creek Greenway. The trail supports safe, accessible outdoor recreation and improved connectivity within the city’s greenway system.
The scope included concrete foundations, curbs, asphalt paving, stone assemblies, metal fabrications, and signage. Additional work involved masonry, irrigation, landscaping, electrical distribution, site lighting, and pavement markings to ensure long-term durability and user safety.
Market
MunicipalArchitect/Engineer
Slay EngineeringType
New ConstructionSize
39,600 sfGET A QUOTE
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat incididunt ut laboret.
