Champion HS Tennis Court Drainage Improvements
This project addressed drainage and sitework improvements at Champion High School’s active tennis facility. The scope included removal and replacement of the existing drainage system and adjacent concrete pavement to improve water flow and surface durability.
Work was performed in close proximity to both an active tennis court and a public roadway, requiring careful site coordination and safety measures. Additional improvements included fencing, landscape restoration, and drainage utility upgrades to ensure long-term performance and minimal disruption to campus operations.
Market
K-12Architect/Engineer
MTR EngineersType
RenovationOwner
Boerne ISDChampion HS Tennis Court Drainage Improvements
San Antonio
March 2024
This project addressed drainage and sitework improvements at Champion High School’s active tennis facility. The scope included removal and replacement of the existing drainage system and adjacent concrete pavement to improve water flow and surface durability.
Work was performed in close proximity to both an active tennis court and a public roadway, requiring careful site coordination and safety measures. Additional improvements included fencing, landscape restoration, and drainage utility upgrades to ensure long-term performance and minimal disruption to campus operations.