Champion HS Tennis Court Drainage Improvements

San Antonio
March 2024

This project addressed drainage and sitework improvements at Champion High School’s active tennis facility. The scope included removal and replacement of the existing drainage system and adjacent concrete pavement to improve water flow and surface durability.

Work was performed in close proximity to both an active tennis court and a public roadway, requiring careful site coordination and safety measures. Additional improvements included fencing, landscape restoration, and drainage utility upgrades to ensure long-term performance and minimal disruption to campus operations.

Market

K-12

Architect/Engineer

MTR Engineers

Type

Renovation

Owner

Boerne ISD

Champion HS Tennis Court Drainage Improvements

San Antonio
March 2024

This project addressed drainage and sitework improvements at Champion High School’s active tennis facility. The scope included removal and replacement of the existing drainage system and adjacent concrete pavement to improve water flow and surface durability.

Work was performed in close proximity to both an active tennis court and a public roadway, requiring careful site coordination and safety measures. Additional improvements included fencing, landscape restoration, and drainage utility upgrades to ensure long-term performance and minimal disruption to campus operations.

Market

K-12

Architect/Engineer

MTR Engineers

Type

Renovation

Size