Marshall High School Cafeteria & Kitchen Renovations
This 18,000-square-foot renovation at Marshall High School modernized the cafeteria and kitchen to better serve students and staff. The project included demolition of existing toilet rooms, the scullery, and adjacent hallway, along with reconstruction of the courtyard area to address site drainage issues.
A new 1,316-square-foot addition was constructed to house refrigerated, frozen, and dry pantry storage. Work included concrete, masonry, metals, carpentry, thermal protection, finishes, MEP systems, fire protection and alarm, and security/telecommunications to deliver a fully upgraded food service facility.
Market
K-12Architect/Engineer
Garza/Bomberger & AssociatesType
New ConstructionRenovation
Size
45,701 sfOwner
Northside ISDMarshall High School Cafeteria & Kitchen Renovations
San Antonio
August 2018
This 18,000-square-foot renovation at Marshall High School modernized the cafeteria and kitchen to better serve students and staff. The project included demolition of existing toilet rooms, the scullery, and adjacent hallway, along with reconstruction of the courtyard area to address site drainage issues.
A new 1,316-square-foot addition was constructed to house refrigerated, frozen, and dry pantry storage. Work included concrete, masonry, metals, carpentry, thermal protection, finishes, MEP systems, fire protection and alarm, and security/telecommunications to deliver a fully upgraded food service facility.
Market
K-12Architect/Engineer
Garza/Bomberger & AssociatesType
New ConstructionRenovation
Size
45,701 sfGET A QUOTE
Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat incididunt ut laboret.
