Linton ES Canopies

San Antonio
November 2010

This project at Linton Elementary School involved the renovation and connection of existing front entry canopies to improve weather protection and pedestrian flow.

Scope included removal and replacement of the existing standing seam metal roof, demolition of the concrete walkway between existing canopy structures, and installation of a new concrete slab and connecting canopy. Work also included fabrication and installation of structural steel and decking, repainting of both new and existing elements, and installation of prefinished standing seam metal roofing with associated sheet metal detailing.

Market

K-12

Architect/Engineer

Austech Engineering

Type

Renovation

Owner

Northside ISD

Linton ES Canopies

San Antonio
November 2010

This project at Linton Elementary School involved the renovation and connection of existing front entry canopies to improve weather protection and pedestrian flow.

Scope included removal and replacement of the existing standing seam metal roof, demolition of the concrete walkway between existing canopy structures, and installation of a new concrete slab and connecting canopy. Work also included fabrication and installation of structural steel and decking, repainting of both new and existing elements, and installation of prefinished standing seam metal roofing with associated sheet metal detailing.

Market

K-12

Architect/Engineer

Austech Engineering

Type

Renovation

Size

GET A QUOTE

We’re glad you found us! At CGC General Contractors, we’re here to support you—whether you’re starting a new project, looking for expert guidance, or just have a question. Send us a message and we’ll get back to you soon.